Bath/shower reno — and a surprise built-in (days 4 through 8)


IMG_1979
By Elle

The bathroom/shower reno is coming to a close — and with flying colors! Days 4 through 8 consisted of tiling, grouting and adding a built-in (a last-minute decision) that we picked up from the Kraftmaid outlet in Warren, Ohio. And did we get lucky. Continue reading